More for Less
A more sustainable way to design, deliver and use projects.
More for Less is a sustainability-management approach focused on achieving better outcomes while using fewer resources over the design life of a project. It brings together the right people, knowledge, processes and measurable objectives from the earliest stages, helping teams make informed decisions that are both sustainable and cost-effective.
Sustainable outcomes
Better outcomes for people and the planet
Right project team
Highly qualified and collaborative teams
Cost-effective sustainability
Processes that are flexible and adaptable over the long-term
Climate response
The growing psychological response to the climate crisis (UNICEF)
The Meaning of SUSTAINABILITY
THE MEANING of SUSTAINABILITY: the outcome of projects that improve lives today while protecting the planet and resources for future changes.
SUSTAINABLE OUTCOMES are best achieved by assembling the most highly-qualified key, project team-members with relevant skills, for regulatory approval prior to project commencement, starting with the project owner!
COST-EFFECTIVE SUSTAINABILITY requires processes that are flexible and adaptable over the long-term.
CLIMATE ANXIETY – the growing psychological response to the climate crisis (UNICEF).
DOCUMENT describing mathematical nature of the structural system’s groups, sets and elements (to follow).
United Sustainability Plan of Work
01 - Pre-qualification
(Pre-Commencement Solar System Team)
02 - Briefing Process
(Preliminary Synthesis of Outcomes)
03 - Design Brief Implementation
(Development Synthesis of Design Brief)
04 - Technical Design
(Implementation of Design Brief and Project Performance in Use)
05 - Manufacturing & Construction
(Pre-Commencement Solar System Team)
06 - Completion & Handover
(Pre-Commencement Solar System Team)
07 - Use
(Pre-Commencement Solar System Team)
The Seven Stages in Detail
Pre-qualification Stage
1a. Prior to Commencement, (Project team assembly). Industry project owners must have their proven record of performance-excellence in leadership and other relevant tasks assessed and approved by system leaders. 1b. Prior to Commencement, (Preparation and guidance). An available value-management selective service is offered
Briefing Process
2a. Design Brief Appraisal. Preliminary study of the project owner's needs and objectives, relevant to the business case and possible constraints on development, prioritising the unified team's work approach needed to achieve the pre-agreed cost and science-based-targets (SBTs). Preparation of feasibility studies and assessment of options to allow the owner to decide whether to proceed. 2b. Design Brief Development. Review initial statement of requirements and develop the Design Brief, challenging and confirming key requirements and constraints.
Design Brief Implementation
Review previous groups of elements. Preparation of additional data, concept design and outline proposals for specifications and preliminary cost plan. Development of concept design to include structural and building services systems. Review and update outline specifications and cost plan. Complete and submit Project Brief. Application for detailed planning permission.
Technical Design
Review previous groups of elements and develop Stage 4 group of elements. Preparation of technical design(s) and specifications, sufficient to coordinate components and elements of the project and information for statutory standards and construction safety.
Manufacturing & Construction
Review previous groups of elements and develop Stage 5 group of elements. Mobilisation; letting the building contract and appointing the contractor. Issuing information and arranging site handover to the contractor. Administration of the building contract to Practical Completion.
Completion & Handover
Review previous groups of elements and develop Stage 6 group of elements. Administration of the building contract after Practical Completion, assisting building user and verification of outcomes.
Use
Review previous groups of elements and develop Stage 7 group of elements. Post Practical Completion and review of Project Performance in use.
Assessment of potential Sustainability Benefits (SBs)
with the help of a Gut Feel Index (GFI)
| Comparative Product Types | 'Patioroom' | 'Pillowrap' | 'SOS Coffee Pastilles' | |||
|---|---|---|---|---|---|---|
| Value (4.4) | Value | Value | ||||
| £5,499 (RSP) | £19.95 (RSP) | £4.99 (RSP) | ||||
| Potential Sustainability Benefits identified in the Brief |
IR/Bg | IR/Cn. | IR/Bg | IR/Cn. | IR/Bg | IR/Cn. |
| 1. 'Product Market Gap' filled | 10 | 9 | 10 | 10 | 10 | 10 |
| 2. 'Multi-use Flexibility' Increased | 10 | 9 | 9 | 9 | 9 | 9 |
| 3. 'Health & Safety benefits' Increased | 8 | 9 | 10 | 10 | 10 | 10 |
| 4. 'Savings in Time, Cost and Effort' Increased | 10 | 9 | 9 | 8 | 10 | 10 |
| 5. 'Passive Design' Increased | 10 | 10 | 8 | 9 | 8 | 9 |
| 6. Use of 'Traditional Forms & Values' Increased | 8 | 9 | 9 | 10 | 9 | 9 |
| 7. 'Adjustable Adaptability' Increased | 6 | 7 | 7 | - | 9 | - |
| 8. 'Product Range Extendibility' Increased | 8 | 8 | - | - | 8 | 8 |
| 9. 'Market Distribution' simplified | 8 | 7 | 8 | 6 | 9 | 9 |
| 10. 'Ease of Use by all' Increased | 8 | 6 | 8 | 8 | 10 | 10 |
| 11. Need for 'Life-cycle Maintenance' reduced | 9 | 9 | 8 | 8 | 7 | 7 |
Gut Feel Index (GFI)
Deciding the level of importance can be a balance between ‘head’ and ‘heart’, with help from this Gut Feel Index:
Go, Great – a Winner
Good Idea – I'll Buy In
It looks Pretty Good
The Idea has Some Merits – worth exploring
I'll give the idea the Benefit of the Doubt
There are some Small Redeeming Benefits
You haven't satisfied the "Yes if..."
I just Don't Like It
No Way – too Risky
Establish the Importance Rating (IR) at the Briefing stage (IR/Bg), re-assess during the design process and measure ‘success’ after Completion (IR/Cn). An IR below 6 may be disregarded.
Need to make cost-savings of at least 30%
DOCUMENT justifying need to make cost-savings of at least 30% in Design-life resource costs (including natural-resource costs). The focus is on the whole design life of the project, not just the initial cost.
Design
Construction
Use
Maintenance
Long-term performance
Cost-effective sustainability
Sustainability that works in the real world
Cost-effective sustainability requires processes that are flexible, adaptable and focused on the long term.
Flexible
Respond to changing project requirements.
Adaptable
Evolve as knowledge, technology and circumstances change.
Long-term
Focus on the entire design and use life of the project.
Collaborative
Based on the combined knowledge of the project team and specialists.
Evidence-led
Supported by appropriate assessment, review and measurable targets.